8-12-2009_7LR7730
Available for hire.
The crack(ed?) erection team.
The side walls are hung and adjusted and secured until Rob can return to complete the final steps.
Earth to Rob...
Rob surveys his ship.
Jo Ann and Leslie have the side wall insulation while the men finish installing the interior wind and snow kit supports.
The dome springs are fastened into place and the dome opener is installed and tested -- successfully!
John's spaceship.
Available for hire.
Available for hire.
Available for hire.
See photo in original gallery.